News Center

The company has established the enterprise goal of "survival by quality, reputation by quality, and development by quality. Strengthen the training of technical personnel, and constantly enrich the first-line technical force to ensure the normal operation of the quality assurance system.

Emulsion pot boot operation


Release time:

2019-08-13

 

1, first add materials, it is strictly prohibited to empty tank boot, materials shall not be less than 5% volume. So as not to burn the mixer shaft sleeve. The added materials shall not exceed the 70% of the tank volume, so as to avoid the overflow of materials and scald when mixing;

 

2. Open the circuit breaker of the stirring motor and start stirring;

 

3. Open the steam stop valve and adjust it to the appropriate opening. Check the drain valve for drainage. If there is no drainage, please inform the equipment power department for maintenance. Observe the temperature gauge of the tank body, and properly close the stop valve when the temperature exceeds the set value.

 

Emulsifying potIn operation, the process operation procedures shall be strictly implemented, and over-temperature, over-pressure and overload operation are strictly prohibited.. Due to customer customizationEmulsifying potThe parameter configuration is slightly unnecessary, and the specific reference process shall be in accordance with the actual operation.