Vacuum emulsifying machine stop washing and waste treatment method


Release time:

2019-07-01

In order to improve the essential safety of the vacuum emulsifying machine production line, reduce the occurrence of such explosion accidents, and ensure that the quality of explosives meets the requirements of national standards, the following tests were carried out on the shutdown flushing and waste treatment of the vacuum emulsifying machine: Method 1: Use the cooling circulating water in the soaking cooler to flush the ammonium nitrate in the waste. 1. Operation method: start the automatic flushing procedure of the system after shutdown, flush the oil-water pipeline and vacuum emulsifier normally for more than three minutes, put the bag containing flushing waste into the drainage ditch, and use circulating water to clean the flushed waste twice to reduce the generation of ammonium nitrate crystals. 2. Principle of vacuum emulsifying machine

In order to improvevacuum emulsifying machineThe intrinsic safety of the production line reduces the occurrence of such explosive accidents and ensures that the quality of explosives meets the requirements of national standards.vacuum emulsifying machineShutdown flushing and waste disposal were tested as follows:

Method 1: The ammonium nitrate in the waste is washed by cooling circulating water in the leach cooler.

1. Operation method: start the system automatic flushing program after shutdown, and conduct the oil-water phase pipeline,vacuum emulsifying machineRinse normally for more than three minutes, put the bag containing the flushing waste into the drainage ditch, and use circulating water to clean the flushed waste twice to reduce the production of ammonium nitrate crystals.

   2、vacuum emulsifying machinePrinciple analysis: using circulating water to dilute and dissolve ammonium nitrate in waste.

3. Effect: There are still ammonium nitrate crystals in the waste, but the quantity is obviously reduced.

Method 2: After the ammonium nitrate solution in the water phase pipeline is cleaned with clean water, the automatic flushing system is started for normal flushing.

1. Operation method: After shutdown, manually open the water phase flushing valve on the console to flush the ammonium nitrate solution in the water phase pipeline and filter. After connecting about four barrels of water from the water phase three-way valve, manually close the water phase cleaning valve, then open the automatic cleaning program in the system. After normal flushing for three minutes, stop the flushing program.

2. Principle analysis: reducing the amount of ammonium nitrate in the flushing process is the key. After the ammonium nitrate solution in the pipeline is cleaned, automatic flushing is started. The oil phase in the pipeline, the residual matrix in the emulsifier and water are discharged through the outlet of the emulsifier, and there is no residual ammonium nitrate crystal.

3. Effect: There is no ammonium nitrate crystal in the waste, and the effect is obvious.

2. after the test, the following conclusions are drawn:

1. Rinse firstvacuum emulsifying machineThe water phase pipeline starts the automatic flushing process again, and there is no ammonium nitrate crystal in the collected waste.

2. The waste was reworked, and no obvious ammonium nitrate particles were found.

3. The content of ammonia nitrogen in wastewater is greatly reduced.

4 After successful consultation with relevant electromechanical experts, the method of flushing the water phase pipeline first and then automatic flushing is adopted to reduce ammonium nitrate crystals in the waste, thus avoiding energy accumulation caused by blocking the charging pipeline and reducing crystal friction during the charging process, eliminating accidents caused by this, and improving the intrinsic safety of the production line. This method is feasible for flushing.