News Center

The company has established the enterprise goal of "survival by quality, reputation by quality, and development by quality. Strengthen the training of technical personnel, and constantly enrich the first-line technical force to ensure the normal operation of the quality assurance system.

Vacuum emulsifying pot daily work operation guide


Release time:

2019-05-14

Oil-water pot: ① switch on the power supply; ② feed the oil-water pot; ③ close the lid of the oil-water pot; ④ heat and stir the oil-water pot; ⑤ open the discharge valve to discharge. Homogenizing pot: ① Turn on the power supply; ② Cover the homogeneous pot cover; (Preheating can be carried out first, which is specifically controlled by the user) ③ Open the vacuum valve on the pot cover and close other valves. The vacuum pump vacuumizes. After reaching a certain vacuum degree, open the suction valve to suck material. ④ (Close the suction valve) Open the homogenization stirring for emulsification (emulsification is completed and heating is stopped);⑤ (close the vacuum valve and then vacuum pump) Open the bottom valve to release, at the same time, open the pressure valve and start the discharge of the pressure pump; ⑥ (cleaning and blowdown).

Oil and water pot:
 
① Connect the power supply; ② Feed the oil-water pot; ③ close the lid of the oil-water pot; ④ Heat and stir the oil-water pot; ⑤ Open the discharge valve to discharge the material.
 
Homogenizing pot:
 
① Turn on the power supply; ② Cover the homogeneous pot cover; (Preheating can be carried out first, which is specifically controlled by the user) ③ Open the vacuum valve on the pot cover and close other valves. The vacuum pump vacuumizes. After reaching a certain vacuum degree, open the suction valve to suck material. ④ (Close the suction valve) Open the homogenization stirring for emulsification (emulsification is completed, stop heating);⑤ (Close the vacuum valve and then close the vacuum pump) Open the pot bottom valve to discharge valve, at the same time, open the pressure valve and start the discharge of the pressure pump; ⑥ (cleaning and blowdown).